Working with Job Scheduler

To help understand how to work with the Job Scheduler, several basic examples are presented, followed by detailed descriptions of the commands involved under Job Scheduler commands.

Port toggle example

This example creates a port toggle job and then schedules the job for execution on Monday and Friday night at 11:45 PM.

Creating a port toggle job named PTog1:

switch(config)# job PTog1 switch(config-job-PTog1)# desc Toggle port 1/1/1 switch(config-job-PTog1)# 10 cli config switch(config-job-PTog1)# 20 cli interface 1/1/1 switch(config-job-PTog1)# 30 cli shutdown switch(config-job-PTog1)# 40 delay 10 cli no shutdown switch(config-job-PTog1)# 50 cli end switch(config-job-PTog1)# exit

Creating a schedule named PT2xW that runs the port toggle job PTog1 on Mondays and Fridays at 11:45 PM, starting on August 2 2021, with a one-year duration:

switch(config)# schedule PT2xW switch(config-schedule-PT2xW)# desc Monday & Friday 11:45 PM port toggles switch(config-schedule-PT2xW)# 10 job PTog1 switch(config-schedule-PT2xW)# trigger on 23:45 weekly 2,6 count 104 start 2021-08-02 switch(config-schedule-PT2xW)# exit

Showing the port toggle job information after first execution:

switch# show job PTog1 Job Name : PTog1 Enabled : Yes Description : Toggle port 1/1/1 Status : waiting Number of commands : 5 Total execution count : 1 Failed execution count : 0 Job execution history --------------------- Instance number : 1 Execution status : success Execution start time : Mon Aug 2 23:45:00 2021 Execution duration : 10s Job CLI commands ---------------- 10 cli config 20 cli interface 1/1/1 30 cli shutdown 40 delay 10 cli no shutdown 50 cli end

Showing the port toggle job schedule information after first execution:

switch# show schedule PT2xW Schedule Name: PT2xW Schedule config --------------- Description : Monday & Friday 11:45 PM port toggles Enabled : Yes Trigger type : calendar Transient : No Max trigger count : 104 Trigger start date : 2021-08-02 23:45 Schedule Status --------------- Trigger status : active Next trigger time : Fri Aug 6 23:45:00 2021 Triggered count : 1 Scheduled Jobs -------------- 10 : PTog1

Showing the port toggle job most recent execution output:

switch# show job PTog1 execution-output 1 ================================================================================= Command: config time: Mon Aug 2 23:45:00 2021 ================================================================================= ================================================================================= Command: interface 1/1/1 time: Mon Aug 2 23:45:00 2021 ================================================================================= ================================================================================= Command: shutdown time: Mon Aug 2 23:45:00 2021 ================================================================================= ================================================================================= Command: cli no shutdown time: Mon Aug 2 23:45:10 2021 ================================================================================= ================================================================================= Command: end time: Mon Aug 2 23:45:10 2021 =================================================================================

Switch reboot example

This example creates a switch reboot job and then schedules the job for execution on the last day of every month at 3:00 AM.

Creating a job named Reboot_sw1 that saves the running configuration and then reboots the switch:

switch(config)# job Reboot_sw1 switch(config-job-Reboot_sw1)# desc Save config then reboot switch switch(config-job-Reboot_sw1)# 10 cli config switch(config-job-Reboot_sw1)# 20 cli write mem switch(config-job-Reboot_sw1)# 30 cli boot system switch(config-job-Reboot_sw1)# exit switch(config)#

Creating a schedule named RB_LDM that runs the switch reboot job Reboot_sw1 on the last day of the month at 3:00 AM, starting on January 31 2022, with a two-year duration:

switch(config)# schedule RB_LDM switch(config-schedule-RB_LDM)# desc Monthly reboot 3:00 AM switch(config-schedule-RB_LDM)# 10 job Reboot_sw1 switch(config-schedule-RB_LDM)# trigger on 3:00 monthly 31 count 24 start 2022-01-31 switch(config-schedule-RB_LDM)# exit switch(config)#

After the RB_LDM schedule triggers the reboot job Reboot_sw1, the show events command is available to show schedule triggering (<MODEL> represents the switch model number):

switch# show events -a -d schedulerd --------------------------------------------------- Event logs from previous boots --------------------------------------------------- ... 2022-01-31T03:00:14.405135+00:00 <MODEL> schedulerd[2054]: Event|12202|LOG_INFO|AMM|1/1|Schedule RB_LDM triggered, trigger_count: 1 --------------------------------------------------- Event logs from current boot --------------------------------------------------- switch#