Link Search Menu Expand Document

   Gateway Clustering with AOS-10
14-Oct-26

AOS-8 Campus to AOS-10 Tunnel: Production Cutover

This guide describes the production execution phase of the AOS-8 to AOS-10 campus migration for the OWL reference deployment, following the example workflow illustrated in the diagram below.

AOS-10 Upgrade Workflow Example

This phase introduces intentional, temporary service impact at defined points. Each step includes validation checkpoints and rollback paths to prevent uncontrolled outages.

Table of contents

Prerequisites

Production cutover assumes the following are complete and unchanged:

  • Discovery -> Staging contract artifacts finalized
  • Central objects fully staged (Library, Groups, Sites)
  • Pilot gateway cluster created and healthy
  • WLANs created and tested
  • Rollback procedures tested and access confirmed
  • Maintenance window approved
  • Confirm the existing AOS-8 evironment’s controller discovery is configured properly, whether it is AP system profile, DHCP options, DNS, or ADP.
    • If AP system profiles use LMS IP addresses, point them at the controllers’ VRRP virtual IP - not an individual controller’s management IP - so APs are not stranded if they reboot after their statically-configured controller is upgraded first.
    • More information about AP controller discovery can be found in the AOS-8 to 10 Planning Guide’s Access Points section.

If any of the above conditions are not met, do not begin production cutover.

Production Cutover Overview (OWL Sequence)

The OWL migration example follows a phased controller upgrade strategy to minimize blast radius:

Step 1 Consolidate APs onto a single AOS-8 controller

Step 2 Introduce AOS-10 incrementally using a test AP

Step 3 Expand migration in controlled AP batches

Step 4 Complete controller upgrade and validate

This approach ensures that at every step, recovery options remain available.

Pre-Upgrade Baseline Capture (AOS-8)

Run these before migration and save the output as the baseline.

On each AOS-8 controller where the gateways and APs terminate:

no paging
encrypt disable(optional)
show run
show version
show ap database long
show ap lldp neighbors
show ap association
show user-table
show ap essid
show ap active

Move All APs to Controller 1

Impact: Minimal to no service interruption expected provided the controllers are in L2 cluster mode .

Objective: Ensure that one controller remains fully operational while the other is upgraded.

The two controllers at this site have been configured in a cluster at Layer 2 (L2) for redundancy and load balancing of access points (APs). Before starting the manual upgrade of a controller in an ArubaOS 8.x L2 cluster, it is important to ensure that the cluster is operating as expected and to take steps that minimize any impact on the network. Verifying that the cluster is running in L2-connected mode and then proactively moving all APs to the other, still-active controller helps maintain seamless service continuity and reduces downtime.

The following steps are for confirming cluster stability and moving APs to one of the two AOS-8 controllers in preparation for an upgrade.

Step 1 Verify the cluster is L2-connected.

  • Purpose: Verify that the controllers in the cluster recognize each other as cluster members and are L2-connected.

    Command:

    (HQ-BAR1-MC01) [MDC] #show lc-cluster group-membership
    

Step 1 Move all APs to controller 1.

  • Purpose: Although Aruba APs in an L2-connected controller cluster are designed to failover automatically to the second controller in case of a failure, proactively transferring all APs to the controller that will remain operational allows for a more controlled transition. This gives the upgrading engineer one less concern during the upgrade of the primary controller.

    Command (issued on cluster leader from previous step’s output):

    (HQ-BAR1-MC02) [MDC] #apmove all target-v4 172.16.23.47
    

Checkpoint:

  • All APs are associated to Controller 1
  • Clients remain associated
  • No abnormal authentication failures observed

Rollback: If AP move fails, rebalance APs across controllers and resolve cluster issues before proceeding.

Upgrade First Controller to AOS-10

Impact: None (Controller 2 has no APs)

Objective: Introduce the first AOS-10 gateway without impacting production traffic.

After all APs have been successfully moved to controller 1 (MC01), the upgrade of the first controller (MC02) can begin. The following steps outline how to download the AOS-10 software, upload it to the controller, initiate the upgrade, and verify its status after the reboot. This approach helps maintain a smooth and reliable transition to the new software version.

Step 1 Download AOS-10 software from HPE Networking Support Portal.

Step 2 Log into MC02 directly through its IP or FQDN.

Step 3 Go to the Maintenance > Software Management > Upgrade tab and install the recently downloaded AOS-10 image, but do not reboot until next step.

8to10Demo-InstallAOS10LocalFile

Always perform a backup and save a copy of the appliance configuration prior to any upgrade.

Step 4 When the upgrade task completes and image has been loaded to the expected partition, erase the existing configuration and reload through CLI so it can be provisioned in Central:

   (HQ-BAR1-MC02) #write erase
   (HQ-BAR1-MC02) #reload
Ensure the controller has been removed from any assigned Activate folder with existing provisioning rules before it connects to Central.

Step 5 Follow the steps in the Onboard Gateways via Full-Setup Method section on the Configuration and Staging page (adapted for the production controller in this phase), then proceed to the next section.

Checkpoint:

  • Controller 2 appears healthy in Central
  • No configuration sync failures
  • Management and Central connectivity verified

Rollback: Revert Controller 2 to AOS-8 if the upgrade fails or Central onboarding is unstable.

Upgrade a Single Test AP to AOS-10

Note: AOS-8 APs converted to AOS-10 using this method should be onboraded into GreenLake and preprovisioned in Central prior to issuing an ap convert command below. Follow the steps in the Provision Devices in Central section of the Configuration and Staging chapter.

Impact: Limited to the test AP coverage area

Objective: Validate the end-to-end AOS-10 at Barcelona_1 before moving the rest of the APs.

Before upgrading the entire fleet of access points, test the conversion process on a single device.

Instructions: Follow the steps in the Migrating controller-managed APs to AOS-10 page of the AOS-10 guide.

The table below lists the commands run for OWL’s first Barcelona_1 AP, in order. They verify that the AOS-8 controller is configured with the expected DNS and NTP servers and monitor the AOS-8 AP database as the AP reboots during the upgrade.

#CLI CommandPurposeOutput to search for
1(HQ-BAR1-MC01) [MDC] #show running-config | include NTPVerify NTP server is configured on controllerNTP server IP address or FQDN
2(HQ-BAR1-MC01) [MDC] #show running-config | include name-serverVerify DNS server is configured on controllerDNS server IP address
3(HQ-BAR1-MC01) [MDC] #ping common.cloud.hpe.comVerify controller can resolve FQDNResolves IP address
4(HQ-BAR1-MC01) [MDC] #show ap databaseBaseline AP inventory informationHQ-BAR1-AP10 shows status Up
5(HQ-BAR1-MC01) [MDC] #ap convert add ap-name HQ-BAR1-AP10Add first AP to convert listNone
6(HQ-BAR1-MC01) [MDC] #ap convert pre-validate specific-apsInitiate pre-validate checkWarning prompt. Answer “y” to proceed
7(HQ-BAR1-MC01) [MDC] #show ap convert-statusMonitor pre-validate statusUpgrade State shows Pre Validate Success
8(HQ-BAR1-MC01) [MDC] #ap convert cancelClear pre-validate checkNone
9(HQ-BAR1-MC01) [MDC] #ap convert active specific-aps server http common.cloud.hpe.com path ccssvc/ccs-system-firmware-registry/IAP ArubaOS_Norma_10.7.2.6_96203Initiate upgrade of first AP-655 (Norma) image to 10.7.2.6Warning prompt. Answer “y” to proceed
10(HQ-BAR1-MC01) [MDC] #show ap convert-statusMonitor upgrade statusCurrent status shows Update Done
11(HQ-BAR1-MC01) [MDC] #show ap databaseVerify AP is offline in controller inventoryHQ-BAR1-AP10 shows status Down
NOTE: 
For line 9 above, see the Migrating controller-managed APs to AOS-10 page in the AOS-10 guide for guidance on finding the correct image. 

The example log file below shows the commands listed in the table above and their outputs.

(HQ-BAR1-MC01) [MDC] #show running-config | include ntp
Building Configuration...
netservice svc-ntp udp 123 
    user any svc-ntp permit 
    ipv6 user any svc-ntp permit 
ntp 
ntp server pool.ntp.org 
(HQ-BAR1-MC01) [MDC] #show running-config | include name-server
Building Configuration...
ip name-server 1.1.1.1 
(HQ-BAR1-MC01) [MDC] #ping common.cloud.hpe.com

Press 'q' to abort.
Sending 5, 92-byte ICMP Echos to 3.168.73.38, timeout is 2 seconds:
!!!!!
Success rate is 100 percent (5/5), round-trip min/avg/max = 32.823/34.7556/36.578 ms

(HQ-BAR1-MC01) [MDC] #show ap database

AP Database
-----------
Name          Group    AP Type  IP Address     Status         Flags  Switch IP     Standby IP
----          -----    -------  ----------     ------         -----  ---------     ----------
HQ-BAR1-AP1   OWL_UHD  555      172.16.23.112  Up 1h:35m:9s          172.16.23.47  172.16.23.48
HQ-BAR1-AP10  OWL_UHD  655      172.16.23.179  Up 1h:38m:49s  S      172.16.23.48  172.16.23.47

Flags: 1 = 802.1x authenticated AP use EAP-PEAP;   1+ = 802.1x use EST;    1- = 802.1x use factory cert
       2 = Using IKE version 2;                    4 = WiFi Uplink
       B = Built-in AP;                            C = Cellular RAP;       D = Dirty or no config
       E = Regulatory Domain Mismatch;             F = AP failed 802.1x authentication
       G = No such group;        I = Inactive;     J = USB cert at AP;     L = Unlicensed
       M = Mesh node
       N = Duplicate name;       P = PPPoe AP;     R = Remote AP;          R- = Remote AP requires Auth
       S = Standby-mode AP;      T = Thermal ShutDown;    U = Unprovisioned;    X = Maintenance Mode
       Y = Mesh Recovery
       b = bypass of AP1x timeout;    c = CERT-based RAP;    e = Custom EST cert;    f = No Spectrum FFT support
       i = Indoor;                    o = Outdoor;           l = LAG 802.3ad;        m = Protocol Mismatch
       p = In deep-sleep status;      r = Power Restricted;  s = LACP striping;      t = Temperature Restricted
       u = Custom-Cert RAP;           z = Datazone AP

Total APs:2
(HQ-BAR1-MC01) [MDC] #ap convert add ap-name HQ-BAR1-AP10
(HQ-BAR1-MC01) [MDC] #ap convert pre-validate specific-aps 
WARNING: This command will validate AP to Activate/Central connection, which include NTP time sync. Do you want to proceed with the operation? [y/n]: y
(HQ-BAR1-MC01) [MDC] #show ap convert-status

AP Conversion Parameters
------------------------
Item                             Value
----                             -----
Status                           Active
Mode                             Specific APs
Image Source                     None
Max Simultaneous Converting      1000
Current Simultaneous Converting  0
Auto Reboot                      True
Start Time                       2026-10-07 17:46:51
Current Status                   Pre-Validating

AP Names Listed for Conversion
------------------------------
AP Names
--------
HQ-BAR1-AP10

AP Image Conversion AP Status Summary
-------------------------------------
AP Image Conversion State  Count
-------------------------  -----                   
Pre Validate Success       1
TOTAL                      1

AP Image Conversion Status
--------------------------
AP Name       AP Group  AP Mac             AP Serial #  AP IP          AP Type  Upgrade State         Start Time           End Time             Failure Count  Failure Reason  Central url                                Central Group
-------       --------  ------             -----------  -----          -------  -------------         ----------           --------             -------------  --------------  -----------                                -------------
HQ-BAR1-AP10  OWL_UHD   d0:4d:c6:c3:xx:3b  CNPxxZ242Q   172.16.23.179  655      Pre Validate Success  2026-10-07 17:46:52  2026-10-07 17:46:58  0                              internal-device.central.arubanetworks.com  OWL_HD_APs
(HQ-BAR1-MC01) [MDC] #ap convert cancel
(HQ-BAR1-MC01) [MDC] #ap convert active specific-aps server http common.cloud.hpe.com path ccssvc/ccs-system-firmware-registry/IAP ArubaOS_Norma_10.7.2.6_96203
WARNING: This command will permanently write a country code on the selected APs if they currently don't have one. Once the country code is written, it cannot be modified. Do you want to proceed with the operation? [y/n]: y
(HQ-BAR1-MC01) [MDC] #show ap convert-status

AP Conversion Parameters
------------------------
Item                             Value
----                             -----
Status                           Active
Mode                             Specific APs
Image Source                     Image Server
Max Simultaneous Converting      10
Current Simultaneous Converting  0
Auto Reboot                      True
Start Time                       2026-10-07 17:50:47
Current Status                   Update Done

AP Names Listed for Conversion
------------------------------
AP Names
--------
HQ-BAR1-AP10

AP Image Conversion AP Status Summary
-------------------------------------
AP Image Conversion State  Count
-------------------------  -----                   

AP Image Conversion Status
--------------------------
AP Name  AP Group  AP Mac  AP Serial #  AP IP  AP Type  Upgrade State  Start Time  End Time  Failure Count  Failure Reason
-------  --------  ------  -----------  -----  -------  -------------  ----------  --------  -------------  --------------
(HQ-BAR1-MC01) [MDC] #show ap database

AP Database
-----------
Name          Group    AP Type  IP Address     Status        Flags  Switch IP     Standby IP
----          -----    -------  ----------     ------        -----  ---------     ----------
HQ-BAR1-AP1   OWL_UHD  555      172.16.23.112  Up 2h:7m:19s  S      172.16.23.48  172.16.23.47
HQ-BAR1-AP10  OWL_UHD  655      172.16.23.179  Down                 172.16.23.47  0.0.0.0

Flags: 1 = 802.1x authenticated AP use EAP-PEAP;   1+ = 802.1x use EST;    1- = 802.1x use factory cert
       2 = Using IKE version 2;                    4 = WiFi Uplink
       B = Built-in AP;                            C = Cellular RAP;       D = Dirty or no config
       E = Regulatory Domain Mismatch;             F = AP failed 802.1x authentication
       G = No such group;        I = Inactive;     J = USB cert at AP;     L = Unlicensed
       M = Mesh node
       N = Duplicate name;       P = PPPoe AP;     R = Remote AP;          R- = Remote AP requires Auth
       S = Standby-mode AP;      T = Thermal ShutDown;    U = Unprovisioned;    X = Maintenance Mode
       Y = Mesh Recovery
       b = bypass of AP1x timeout;    c = CERT-based RAP;    e = Custom EST cert;    f = No Spectrum FFT support
       i = Indoor;                    o = Outdoor;           l = LAG 802.3ad;        m = Protocol Mismatch
       p = In deep-sleep status;      r = Power Restricted;  s = LACP striping;      t = Temperature Restricted
       u = Custom-Cert RAP;           z = Datazone AP

Total APs:2
(HQ-BAR1-MC01) [MDC] #exit

Exiting Managed Device Shell

Tip:

When monitoring APs remotely, AP conversion can be verified by checking the LLDP neighbor information on the switch they’re connected to.

More details can be found in the Controller Managed APs section of the AOS-10 guide, including troubleshooting commands and steps to revert to AOS-8 if necessary

Checkpoint – Test Client Connectivity:

  • SSIDs broadcast correctly
  • Client authentication succeeds
  • Clients assigned the expected VLAN, role, DHCP address.
  • Traffic forwarding behaves as designed

Fail Path:

Troubleshoot connectivity issues. Rollback the test AP to AOS-8 if issues cannot be resolved quickly. See Revert to AOS-8 Firmware Version.

Post-Upgrade Validation Capture (AOS-10)

Run these after migration and compare the output against the AOS-8 baseline.

On each AOS-10 gateway:

no paging
show run
show version

On specific AP(s):

show running-config
show ap lldp neighbor
show ap association
show ap bss-table
show network

Move Remaining APs

Impact: Wi-Fi service interruption for APs being upgraded

Objective: Expand migration while preserving control and rollback options.

After the first AP upgrade is successful and the standard client testing procedures are finished, the subsequent batch of APs can be upgraded following the same steps outlined in the previous Upgrade a Single Test AP to AOS-10 section.

Checkpoint – Client Connectivity and Roaming:

  • Clients authenticate successfully
  • Roaming works as expected
  • No abnormal disconnect patterns
  • APs online and stable

Fail Path:

Similar to the previous section, troubleshoot connectivity and roaming issues. If issues cannot be resolved quickly, rollback APs. See Revert to AOS-8 Firmware Version.

Upgrade Second Controller to AOS-10

Impact: None (MC01 has no APs)

Objective: Complete the controller/gateway migration and eliminate AOS-8 dependency.

After all APs have been upgraded to the newly upgraded AOS-10 gateway, confirm that MC01 is without APs and repeat the steps in the Upgrade First Controller to AOS-10 section earlier in this document. When the upgrade is complete, proceed to site validation and other remaining steps.

Checkpoint:

  • Gateway cluster healthy
  • VRRP and redundancy validated
  • No client impact observed during failover testing

Rollback: Revert MC01 if cluster health cannot be established.

Exit Criteria for Production Cutover

Production cutover is complete when:

  • All controllers are upgraded to AOS-10 gateways
  • All APs are managed by Central
  • WLANs are stable and performing as designed
  • No dependency on AOS-8 infrastructure remains
  • Formal validation can proceed without configuration changes

Rollback: Revert a Gateway to AOS-8

During the maintenance window, a gateway can be rolled back to its retained AOS-8 image by restoring that image to the inactive partition and selecting it as the boot partition. The example below reverts HQ-BAR1-GW02: the AOS-8 image is copied to partition 1, the partition contents are confirmed with show image version, and the next boot is set to partition 1 before issuing a write erase all command.

(HQ-BAR1-GW02) *#copy scp: <image-server-ip> <username> <path>/ArubaOS_90xx_8.12.0.6_93419 system: partition 1
Password:***********


Upgrading partition 1
Secure file copy:
Press 'q' to abort.
................................................................
File copied successfully.
Saving file to flash:
................................................................................................................................................................................................................................................................................................................................................................................
File ArubaOS_90xx_8.12.0.6_93419 copied to partition 1 successfully.
The system will boot from partition 1 during the next reboot.
(HQ-BAR1-GW02) *#show image version 

----------------------------------
Partition               : 0:0 (/mnt/disk1)
Software Version        : AOS-10 10.7.2.0 SSR (Digitally Signed SHA1/SHA256 - Production Build)
Build number            : 92876
Label                   : 92876
Built on                : Sun Jun 8 23:45:40 UTC 2025
----------------------------------
Partition               : 0:1 (/mnt/disk2) **Default boot**
Software Version        : AOS-8 8.12.0.6 SSR (Digitally Signed SHA1/SHA256 - Production Build)
Build number            : 93419
Label                   : 93419
Built on                : Fri Aug 22 15:26:35 UTC 2025
(HQ-BAR1-GW02) *#boot system 
partition               System Partition

(HQ-BAR1-GW02) *#boot system partition 
0                       Partition 0

**Step 1**                      Partition 1

(HQ-BAR1-GW02) *#boot system partition 1 
<cr>
(HQ-BAR1-GW02) *#write erase all
Controller will be factory defaulted. All the configuration and databases will be deleted. Controller will be reloaded. Press 'y' to proceed : [y/n]: y

Additional Tasks and Resources

Once all WLAN devices have been successfully upgraded to AOS-10, the remaining steps include activities such as validating configurations and communicating with stakeholders. These activities may vary according to each organization’s IT policies. Although not covered in detail in this document, the recommendations below will support a successful implementation and help ensure a positive user experience when employees return to the office on Monday morning.

  • Pre/post-upgrade validation - Use the information collected during the discovery phase to compare site health before and after changes.
  • Troubleshooting - Troubleshooting commands can be found in the Troubleshooting section of the HPE Aruba Networking AOS-10 documentation website.
  • Rollback Planning - Find rollback commands in the Revert to AOS-8 Firmware Version section of the HPE Aruba Networking AOS-10 documentation website.
  • Upgrade Commands - Some CLI upgrade commands not used in this guide can be found in the Upgrade Process section of the HPE Aruba Networking AOS-10 documentation website.
  • Retained vs. Migrated Configuration - Know which information is retained from the previous configuration by visiting the Configuration Retained or Migrated page of the HPE Aruba Networking AOS-10 documentation website.
  • AOS-10 Prerequisites - Validate that all applicable prerequisites are met before migrating any hardware to AOS-10 by visiting the Prerequisites section of the HPE Aruba Networking AOS-10 documentation website.
  • Instant APs and More - The steps to migrate Aruba Instant APs, whether managed by AirWave, Central, or locally by the IAP cluster’s Virtual Controller (VC) can be found in the Access Points page of the HPE Aruba Networking AOS-10 documentation website.

Back: Configuration and Staging